    Data Centre Accreditation Portal

    Register Your
    Data Centre
    with NITA

    Ghana's authoritative two-stage registration framework for commercial Data Centre operators — from breaking ground to going live. Issued pursuant to the NITA Act, 2008 (Act 771).

    2
    Registration Stages
    5 yrs
    Operational Certificate Validity
    Tier III+
    Minimum Required Standard
    Act 771
    Legal Authority
    Registration Journey
    1
    Stage One
    Construction Registration
    Submit before breaking ground · 24-month certificate
    2
    Stage Two
    Operational Registration
    Submit after construction · 5-year certificate
    How It Works

    A clear path from construction
    to operation

    Every commercial Data Centre providing services for a fee in Ghana must complete both stages of registration with NITA before serving customers.

    1
    Stage 1 · Pre-Construction
    Submit Construction Registration
    Complete the Construction Registration Form with architectural plans, site information, and compliance declarations before any construction begins.
    2
    Stage 1 · Review
    NITA Preliminary Review & Site Inspection
    NITA reviews your submission within 5 working days and schedules a technical site inspection. Certificate of Construction Registration is issued upon approval, valid for 24 months.
    3
    Build Phase
    Construct to Approved Specifications
    Carry out construction in accordance with the approved design submissions and all relevant Ghanaian building codes, energy, fire, and environmental regulations.
    4
    Stage 2 · Post-Construction
    Submit Operational Registration
    After construction is complete, submit as-built drawings, final regulatory approvals, governance documents, and operational details via the Operational Registration Form.
    5
    Stage 2 · Certificate
    Receive Operational Certificate & Go Live
    NITA conducts an operational compliance site inspection and issues the Certificate of Operational Registration — valid for 5 years and renewable. You are now authorised to provide Data Centre Services.
    Stage 1 — Construction Registration
    Before Breaking Ground
    24-month certificate Site inspection
    Open Construction Form
    What You'll Need

    Come prepared

    Having these ready before starting your application ensures a smooth and complete submission.

    Corporate Identity
    Legal name as registered with Registrar General's Department, Commercial Registration Number, Date of Incorporation, TIN, and GIPC number (if applicable).
    Site & GPS Details
    Precise physical address, GPS coordinates (latitude/longitude), Ghana Post GPS code, and nearest landmark for the proposed Data Centre location.
    Technical Drawings
    Architectural floor plans, structural drawings, electrical SLDs, HVAC plans, fire suppression layouts, and telecoms cabling infrastructure plans (PDF/DWG, max 50 MB each).
    Regulatory Approvals
    EPA EIA Permit, TCPD Building Permit, GNFS Fire Approval, Energy Commission Clearance, and Data Protection Commission registration references.
    Capacity Specifications
    Total floor area, planned white space (sq. m), initial IT load (MW), planned rack units, number of floors, building type, and targeted Tier classification (Tier III minimum).
    Fee Payment
    Registration and Certificate fees are payable to NITA via bank transfer, mobile money, or cheque. Payment reference must be included in your submission for processing to commence.
    Compliance Framework

    Built on Ghana's
    regulatory foundation

    Data Centre operators must demonstrate compliance with a comprehensive set of Ghanaian regulatory requirements across energy, environment, data protection, and physical safety.

    C1
    Environmental & Planning EPA Environmental Impact Assessment, TCPD Building/Development Permit, Land-use clearance from Metropolitan Assembly
    C2
    Safety & Structural Ghana National Fire Service approval, Electrical inspector clearance, Occupational Health & Safety declaration
    C3
    Energy & Utilities Energy Commission clearance, Generator/fuel storage approvals from NPA, Renewable energy efficiency plan
    C4
    Data Protection & Cybersecurity DPC registration, Data Protection Impact Assessment, Data residency commitment, Cybersecurity Act 2020 compliance

    Need help with your application?

    NITA's Data Centre Registration team is available to assist applicants throughout the process. Allow 7 working days for responses to incomplete applications.

    Lock Screen